After accurately measuring the length, width, thickness and product density (if you don’t know the product density use the density estimator below) of your job, plug in your numbers and we will estimate the amount of aggregate or stone you need to order.

X
X
=
Length (Ft)
Width (Ft)
Depth
Amount of aggregate needed

Gravel-88 lbs per Cu Foot, Stone-99 lbs per Cu Foot, and Bank Run-110, all of these are dry rodder.

Please note: you need to add and purchase 10% more material to this calculation to account for wasted material that is caused by moving and placing material during construction project.